Last edited 02 Dec 2021

Scheduled monuments

Contents

[edit] Introduction

Nationally important sites and monuments can be placed on a schedule by the Secretary of State for Culture, Media and Sport in order to give them legal protection. A schedule has existed since 1882, but the power to schedule is currently provided for by the Ancient Monuments and Archaeological Areas Act 1979.

There are more than 200 different classes of scheduled monument (SM). Monuments can include; standing stones, castles, abandoned villages, collieries and so on together with the land in which they are situated or rely on for support and preservation. They will not always be visible.

There are now around 30,000 sites on the schedule, which can be searched at The National Heritage List for England.

It is a criminal offence to:

Scheduling does not create any new rights of public access and it does not impose an obligation to undertake additional management of the monument. However, owners are encouraged to keep monuments in good condition and there are a range of grant incentive schemes available.

Scheduled monuments can include:

But not:

Monuments can only be scheduled if they are deliberately created structures, features or remains of national importance, and if scheduling is the best means of protection (rather than local planning controls or listing). Historic England have produced detailed guidance for scheduling of different types of monument in different situations.

[edit] The scheduling process

Historic England identifies potential sites in England (the public can make nominations). They then make an assessment of the site and carry out a consultation process, although if there is thought to be a substantial risk of imminent damage or destruction, then a recommendation can be made without consultation.

Recommendations for scheduling are made to the Secretary of State for Culture, Media and Sport who decides whether or not to add the site to the schedule.

Decisions are based on:

  • Extent of survival.
  • Current condition.
  • Rarity.
  • Representivity.
  • Importance of the period to which the monument dates.
  • Fragility.
  • Connection to other monuments, or group value.
  • Potential to contribute to information, understanding and appreciation.
  • Extent of documentation enhancing the monument's significance.

[edit] Scheduled Monument Consent

Prior written permission (Scheduled Monument Consent or SMC) is required from the Secretary of State to carry out work, either above or below ground to scheduled monuments. Works may also require planning permission but this does not remove the need for Scheduled Monument Consent. Listed buildings will not also require listed building consent.

Consent must be obtained from the Secretary of State for Culture, Media and Sport for:

Development affecting the setting of a scheduled monument is a planning matter and does not require Scheduled Monument Consent.

Some works, such as works urgently necessary for safety or health are deemed to have consent under the terms of the Ancient Monuments (Class Consents) Order 1994.

The consent system is administered by Historic England, who advise the Secretary of State on applications. Advice can be obtained by applicants from a local Historic England team and applications should be sent to the local Historic England office. It is advisable to discuss possible works with the Historic England as early as possible, to obtain guidance on the process for application avoid the possibility of unlawful works and avoid delays.

[edit] Related articles on Designing Buildings

[edit] External references:

Designing Buildings Anywhere

Get the Firefox add-on to access 20,000 definitions direct from any website

Find out more Accept cookies and
don't show me this again